  1. A work breakdown structure is
  • a hierarchy of tasks, subtasks, and work packages
  • a Cost and Performance tracking schedule
  • a structure that is incompatible with the Critical Path Method
  • a simple list of the activities making up a project 
Quiz Answers just a click away OPS 571 Week 4 Quiz
  1. The vertical axis on a Gantt chart is usually which of the following?
  • Activities
  • Time
  • Cost
  • Profit
  1. Which of the following identifies a key principle of Reengineering?
  • Organize around tasks.
  • Downsize (layoff) workers and do the same amount of work as before.
  • Merge information processing work into the real work that produces the information.
  • Capture information both at the source and where it is interpreted.
  1. At the onset, a project originates as which of the following?
  • A Gantt chart
  • A series of milestones
  • Critical path method (CPM)
  • A statement of work (SOW 
Want help? Click to download OPS 571 Week 4 Quiz Answers 
  1. Consulting firms typically use which of the following techniques to plan and monitor the engagements of the firm or specific projects?
  • CPM/PERT
  • Qualitative forecasting
  • Materials requirements planning (MRP)
  • Quantitative layout
  1. A Responsibility Chart specifically identifies which of the following?
  • Planning the tasks for a project
  • Customer satisfaction
  • Commitment to quality
  • Level of inventory 
Want more details? Download now OPS 571 All Quiz Answers
  1. Which of the following would be the result of subdividing a project?
  • Job orders
  • Work events
  • Job categories
  • Tasks
  1. Which project progress technique includes the essential features of a project plan, budgeted cost of work scheduled and budgeted cost of work performed?
  • Earned value management
  • Critical path method
  • Cost analysis
  • Gantt chart 
Final Exam Answers just a click away OPS 571 Final Exam
  1. An example of a graphic project report utilized within project management is:
  • Project proposal
  • Equipment and supplies chart
  • Humphrey chart
  • Cost and performance tracking schedule 
About Author
This article covers the topic for the University Of Phoenix OPS 571 Week 4 Quiz. The author is working in the field of education from last 5 years. This article covers the basic of OPS 571 Week 4 Quiz Assignment from UOP.
For further information on the above topics you can always visit the website www.StudentWhiz.com

No comments:

Post a Comment